Commenting open: April 16, 2024 12:00AM AKT - May 16, 2024 11:59PM AKT.
Application for an Oil Discharge Prevention and Contingency Plan - Matanuska Electric Company
An application package for an Oil Discharge Prevention and Contingency Plan, under Alaska Statute 46.04.030 and in accordance with 18 AAC 75, has been received by the Department of Environmental Conservation. The details are as follow:
Applicant: Matanuska Electric Association, Eklutna Generation Station
P.O. Box 2929
Palmer, AK 99645
Proposed Activity: Review of a plan renewal application package for an Oil Discharge Prevention and Contingency Plan that is required to commit adequate resources to meet all planning requirements for prevention and response for a realistic maximum discharge from the operations of Eklutna Generation Station. The Matanuska Electric Association Eklutna power station provides power generally north and east of Eagle River and much of the Matanuska Valley utilizing natural gas fired engines with diesel used as an ignition primer. In the event that natural gas might become unavailable the plant would be fueled by the diesel stored on site. The Eklutna Generation Station stores multiple types of oil and lubricants on site which are used to support ongoing operations.
Location: 28705 Dena’ina Elders Road, Chugiak, AK 99567
Potential Results: A potential risk exists of oil spills entering the lands or waters of the state as a result of this operation.
Activity identified as: State Contingency Plan Number 24-CP-5224
Contact Information
*Indicates Required Fields
Thank you for subscribing to the Application for an Oil Discharge Prevention and Contingency Plan - Matanuska Electric Company mailing list.
An application package for an Oil Discharge Prevention and Contingency Plan, under Alaska Statute 46.04.030 and in accordance with 18 AAC 75, has been received by the Department of Environmental Conservation. The details are as follow:
Applicant: Matanuska Electric Association, Eklutna Generation Station
P.O. Box 2929
Palmer, AK 99645
Proposed Activity: Review of a plan renewal application package for an Oil Discharge Prevention and Contingency Plan that is required to commit adequate resources to meet all planning requirements for prevention and response for a realistic maximum discharge from the operations of Eklutna Generation Station. The Matanuska Electric Association Eklutna power station provides power generally north and east of Eagle River and much of the Matanuska Valley utilizing natural gas fired engines with diesel used as an ignition primer. In the event that natural gas might become unavailable the plant would be fueled by the diesel stored on site. The Eklutna Generation Station stores multiple types of oil and lubricants on site which are used to support ongoing operations.
Location: 28705 Dena’ina Elders Road, Chugiak, AK 99567
Potential Results: A potential risk exists of oil spills entering the lands or waters of the state as a result of this operation.
Activity identified as: State Contingency Plan Number 24-CP-5224
Contact Information
*Indicates Required Fields